Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT KALA KHEL BARA DISTRICT KHYBER | 5.0000 | 100000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|
2 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT SEPAH BARADISTRICT KHYBER | 10.0000 | 200000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|
3 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT AKA KHEL BARA DISTRICT KHYBER | 10.0000 | 200000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|
4 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT SHALOBAR BARA DISTRICT KHYBER | 10.0000 | 200000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|
5 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT KAMAR KHEL BARA DISTRICT KHYBER | 5.0000 | 100000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|
6 | CONSTRUCTION OF STREET, DRAIN,CULVERTS AND SIDE WALL AT MALIK DIN KHEL BARA DISTRICT KHYBER | 10.0000 | 200000 | 0 | |
2025-01-20 12:00 PM
| 2:00PM | As per work order |
Download BOQ
Download SBD
|