Sealed tender for below mentioned works are hereby invited from Govt: Contractors enlisted with PEC in the relevant category and having registration/enlistment renewal for the current year as per following schedule.

Work NoWork NameEstimated Cost (Millions)Earnest Money(Rs.)Tender Form(Rs.)Required PEC CategoryLast Date / Time of online applyDate / Time of OpeningTime LimitDownload BOQ
1Package No.1 U/C Bagh (Revised)2.5000500000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
2Package No.2 U/C Bagnotar (Revised)1.5000300000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
3Package No.3 U/C Nathiagali (Revised)2.4000480000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
4Package No.4 U/C Nagri Bala (Revised)1.5000300000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
5Package No.5 U/C Namli Maira (Revised)0.100020000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
6Package No.6 U/C Phalkot (Revised)2.0000400000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
7Package No.7 U/C Phalkot (Revised)2.2000440000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
8Package No.8 U/C Sarbhana (Revised)1.5000300000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
9Package No.1 U/C Nara (Revised)2.2000440000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
10Package No.2 U/C Langrial (Revised)2.5000500000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
11Package No.3 U/C Dewal Menal (Revised)2.5000500000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
12Package No.4 U/C Gharhi Phulgran (Revised)2.4000480000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
13Package No.5 U/C Langra (Revised)0.5000100000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
14Package No.6 U/C Majohan (Revised)1.0000200000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
15Package No.7 U/C Havelian Cantt (Revised)2.2000440000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
16Package No.8 U/C Havelian Cantt (Revised)2.0000400000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
17Package No.9 U/C Havelian Urban (Revised)1.5000300000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
18Package No.10 U/C Havelian Urban (Revised)2.0000400000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
19Package No.11 U/C Havelian Urban (Revised)2.5000500000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
20Package No.12 U/C Havelian Urban (Revised)2.5000500000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
21Package No.13 U/C Chamhad (Revised)2.0000400000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
22Package No.14 U/C Chamhad (Revised)1.5000300000  2025-01-23 12:00 PM 1:30PMas per work order Download BOQ Download SBD
Terms & Conditions:
1 The award of contract shall be on the basis of above/below engineer estimate on MRS instead of item rate basis.
2 The contractors quoting their bids up to a limit of 10% below Engineer estimate shall submit bid security      @ 2% only of Engineer Estimate.
3 The contractors quoting their bids more than 10% below upto 20% below on Engineer's Estimate shall submit along with their bids 8% Additional Security of Engineer's Estimate cost in addition to 2% bid security. If the bid is not accompanied with the required amount of additional security then it will be considered as non-responsive and the 2% bid security shall be forfeited in favour of Government and the second lowest bidder and so on will be considered accordingly.
4 Similarly, a contractor quoting bid more than 20% below shall submit with his bid an additional security on Engineer's Estimated cost equal to the differential amount of submitted bid and Engineer's Estimate along with detailed rate analysis. In case of more than 20% below bids, if the bid is not accompanied by the detailed rate analysis and / or required amount of additional security, then the said bid shall be considered as non-responsive. All the securities submitted along with such non-responsive bid shall be forfeited in favour of Government and the 2nd  lowest bidder and so on will be considered accordingly.
5 Any such effert to conspire to cartel making shall be considered as violaion of Rule 44 and shall be attributed towards mis-procurement undere Rule 54 of Procurement Rules ibid.
6 The following documents are compulsory with tender form:
i.  The fresh Registration of LCB.
ii. The fresh Registration of KPPRA Revenue.
iii. The downloaded BOQ, Terms & Conditions and 2% security must be attached.
7 After issuing the work order, if the contractor / firm is not commence the work in one week, then the tender will be cancelled including forfeiting of security.
8 According to the Government Laws, all the taxes will be deducted.
9 Incase of receiving equal offers / tie, the award of contract shall be decided through a free toss which shall be final.
10 All those contractor which have incomplete / pending works, are avoid to participate in the tenders and to concentrate / priority on completion of previous incompleted schemes.
11 Work order will be issued on the availability of funds with Tehsil Municipal Administration, Abbottabad.
12 Tender form and BOQ can be downloaded on website www.ebidding.lcbkp.gov.pk
13 All other Terms & Conditions can be seen & follow on the website www.ebidding.lcbkp.gov.pk and from the relevant advertisement which has been advertised on the KPPRA Websit and  in the Newspaper

 

Tehsil Municipal Officer, TMA Abbottabad

0992 - 9210373