Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Last Date / Time of Submission of Tender Forms | Date / Time of Opening | Time Limit | Address of NC / VC | Download BOQ |
1 | Construction of Street Pavement Drains Culverts etc at vc/nc Kharki 1 District Mardan | 1.0000 | 20000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
2 | Construction of Street Pavement Drains Culverts etc at vc/nc Kharki 2 District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
3 | Construction of Street Pavement Drains Culverts etc at vc/nc Mian Essa District Mardan | 0.4000 | 8000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
4 | Construction of Street Pavement Drains Culverts etc at vc/nc Zarin Abad District Mardan | 1.0000 | 20000 |
08-Jun-2020
| 10:30:00 | As per work order | |
Download BOQ
|
5 | Construction of Street Pavement Drains Culverts etc at vc/nc Dheri District Mardan | 1.2000 | 24000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
6 | Construction of Street Pavement Drains Culverts etc at vc/nc Shamozai 2 District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
7 | Construction of Street Pavement Drains Culverts etc at vc/nc Sngao District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
8 | Construction of Street Pavement Drains Culverts etc at vc/nc Charchor District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
9 | Construction of Street Pavement Drains Culverts etc at vc/nc Mian Khan District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
10 | Construction of Street Pavement Drains Culverts etc at vc/nc Qasami District Mardan | 1.6000 | 32000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
11 | Construction of Street Pavement Drains Culverts etc at vc/nc Kohi Barmawal 2 District Mardan | 1.2000 | 24000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
12 | Construction of Street Pavement Drains Culverts etc at vc/nc Sarobi District Mardan | 0.8000 | 16000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
13 | Construction of Street Pavement Drains Culverts etc at vc/nc tazagram District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
14 | Construction of Street Pavement Drains Culverts etc at vc/nc Shamozai 1 District Mardan | 1.5000 | 30000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
15 | Construction of Street Pavement Drains Culverts etc at vc/nc Babuzai Baratkhel District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
16 | Construction of Street Pavement Drains Culverts etc at vc/nc Babuzai abakhil District Mardan | 0.8000 | 16000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
17 | Construction of Street Pavement Drains Culverts etc at vc/nc Alo 1 District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
18 | Construction of Street Pavement Drains Culverts etc at vc/nc Alo 2 District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
19 | Construction of Street Pavement Drains Culverts etc at vc/nc kotki District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
20 | Construction of Street Pavement Drains Culverts etc at vc/nc Dewankhil District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
21 | Construction of Street Pavement Drains Culverts etc at vc/nc Shahbatkhil District Mardan | 1.9000 | 38000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
22 | Construction of Street Pavement Drains Culverts etc at vc/nc Pipal District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
23 | Construction of Street Pavement Drains Culverts etc at vc/nc Shero 2 District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
24 | Construction of Street Pavement Drains Culverts etc at vc/nc Shero 1 District Mardan | 1.3000 | 26000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
25 | Construction of Street Pavement Drains Culverts etc at vc/nc Likpani District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
26 | Construction of Street Pavement Drains Culverts etc at vc/nc Ali District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
27 | Construction of Street Pavement Drains Culverts etc at vc/nc Barikab District Mardan | 1.0000 | 20000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
28 | Construction of Street Pavement Drains Culverts etc at vc/nc Beroch District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
29 | Construction of Street Pavement Drains Culverts etc at vc/nc Bilandi District Mardan | 0.8000 | 16000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
30 | Construction of Street Pavement Drains Culverts etc at vc/nc Charghuli District Mardan | 1.7000 | 34000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
31 | Construction of Street Pavement Drains Culverts etc at vc/nc Jalal Daulatzai District Mardan | 1.1000 | 22000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
32 | Construction of Street Pavement Drains Culverts etc at vc/nc Kata Khat District Mardan | 1.1000 | 22000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
33 | Construction of Street Pavement Drains Culverts etc at vc/nc Khair abad District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
34 | Construction of Street Pavement Drains Culverts etc at vc/nc Kutarpan District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
35 | Construction of Street Pavement Drains Culverts etc at vc/nc Machi District Mardan | 1.3000 | 26000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
36 | Construction of Street Pavement Drains Culverts etc at vc/nc Nodah District Mardan | 0.4000 | 8000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
37 | Construction of Street Pavement Drains Culverts etc at vc/nc Paodheri 1 District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
38 | Construction of Street Pavement Drains Culverts etc at vc/nc Palodheri 2 District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
39 | Construction of Street Pavement Drains Culverts etc at vc/nc Rustaam 1 District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
40 | Construction of Street Pavement Drains Culverts etc at vc/nc Rustam 2 District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
41 | Construction of Street Pavement Drains Culverts etc at vc/nc Katlang 1 District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
42 | Construction of Street Pavement Drains Culverts etc at vc/nc Katlang 3 District Mardan | 1.2000 | 24000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
43 | Construction of Street Pavement Drains Culverts etc at vc/nc Katlang 4 District Mardan | 1.6000 | 32000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
44 | Construction of Street Pavement Drains Culverts etc at vc/nc Sawaldhir 1 District Mardan | 1.5000 | 30000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
45 | Construction of Street Pavement Drains Culverts etc at vc/nc Sawaldhir 2 District Mardan | 0.4000 | 8000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
46 | Construction of Street Pavement Drains Culverts etc at vc/nc Taja District Mardan | 1.4000 | 28000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
47 | Construction of Street Pavement Drains Culverts etc at vc/nc Katlang 2 District Mardan | 1.4000 | 28000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
48 | Construction of Street Pavement Drains Culverts etc at vc/nc chak Mardan 1 District Mardan | 0.4600 | 9200 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
49 | Construction of Street Pavement Drains Culverts etc at vc/nc Jungar Gujarat District Mardan | 0.3600 | 7200 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
50 | Construction of Street Pavement Drains Culverts etc at vc/nc Gujarat 1 District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
51 | Construction of Street Pavement Drains Culverts etc at vc/nc Gujarat 2 District Mardan | 0.7300 | 14600 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
52 | Construction of Street Pavement Drains Culverts etc at vc/nc Shahbazgarhi 2 District Mardan | 0.4620 | 9240 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
53 | Construction of Street Pavement Drains Culverts etc at vc/nc Bakhshali 2 District Mardan | 0.2930 | 5860 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
54 | Construction of Street Pavement Drains Culverts etc at vc/nc Garyala 1 District Mardan | 0.8200 | 16400 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
55 | Construction of Street Pavement Drains Culverts etc at vc/nc Baghecha Dheri 2 District Mardan | 0.9000 | 18000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
56 | Construction of Street Pavement Drains Culverts etc at vc/nc Kodinaka District Mardan | 0.7300 | 14600 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
57 | Construction of Street Pavement Drains Culverts etc at vc/nc Bakhshali 1 District Mardan | 0.4880 | 9760 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
58 | Construction of Street Pavement Drains Culverts etc at vc/nc Fatima 2 District Mardan | 0.7970 | 15940 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
59 | Construction of Street Pavement Drains Culverts etc at vc/nc Fatima 1 District Mardan | 0.3490 | 6980 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
60 | Construction of Street Pavement Drains Culverts etc at vc/nc Chamdheri District Mardan | 0.8280 | 16560 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
61 | Construction of Street Pavement Drains Culverts etc at vc/nc Garhi Ismailzai 1 District Mardan | 0.5190 | 10380 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
62 | Construction of Street Pavement Drains Culverts etc at vc/nc Garhi Ismailzai 2 District Mardan | 1.6000 | 32000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
63 | Construction of Street Pavement Drains Culverts etc at vc/nc kot Ismailzai District Mardan | 1.1000 | 22000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
64 | Construction of Street Pavement Drains Culverts etc at vc/nc Kot Daulatzai District Mardan | 1.0430 | 20860 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
65 | Construction of Street Pavement Drains Culverts etc at vc/nc Mayyar 1 District Mardan | 0.6610 | 13220 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
66 | Construction of Street Pavement Drains Culverts etc at vc/nc Mohib Banda 1 District Mardan | 1.2520 | 25040 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
67 | Construction of Street Pavement Drains Culverts etc at vc/nc Mohib banda 2 District Mardan | 0.7890 | 15780 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
68 | Construction of Street Pavement Drains Culverts etc at vc/nc Chak Shabzagarhi District Mardan | 1.2160 | 24320 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
69 | Construction of Street Pavement Drains Culverts etc at vc/nc Chak Toru District Mardan | 0.3280 | 6560 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
70 | Construction of Street Pavement Drains Culverts etc at vc/nc Sikaandari 1 District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
71 | Construction of Street Pavement Drains Culverts etc at vc/nc Khawo District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
72 | Construction of Street Pavement Drains Culverts etc at vc/nc Rorya 1 District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
73 | Construction of Street Pavement Drains Culverts etc at vc/nc Hoti 1 District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
74 | Construction of Street Pavement Drains Culverts etc at vc/nc Sikandari 2 District Mardan | 1.1980 | 23960 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
75 | Construction of Street Pavement Drains Culverts etc at vc/nc Sikandar 3 District Mardan | 0.7500 | 15000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
76 | Construction of Street Pavement Drains Culverts etc at vc/nc Ghala Dhir District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
77 | Construction of Street Pavement Drains Culverts etc at vc/nc Rorya 2 District Mardan | 1.6000 | 32000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
78 | Construction of Street Pavement Drains Culverts etc at vc/nc Rorya 3 District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
79 | Construction of Street Pavement Drains Culverts etc at vc/nc Bago Banda District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
80 | Construction of Street Pavement Drains Culverts etc at vc/nc Par hoti 3 District Mardan | 0.6000 | 12000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
81 | Construction of Street Pavement Drains Culverts etc at vc/nc Sheikh Yousaf 1 District Mardan | 0.6960 | 13920 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
82 | Construction of Street Pavement Drains Culverts etc at vc/nc Dagai 2 District Mardan | 1.2740 | 25480 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
83 | Construction of Street Pavement Drains Culverts etc at vc/nc Bickat Ganj 2 District Mardan | 1.0500 | 21000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
84 | Construction of Street Pavement Drains Culverts etc at vc/nc Dagai 1 District Mardan | 0.4920 | 9840 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
85 | Construction of Street Pavement Drains Culverts etc at vc/nc BAghe e eram rural District Mardan | 0.3370 | 6740 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
86 | Construction of Street Pavement Drains Culverts etc at vc/nc Baghe e eram 3 District Mardan | 1.1850 | 23700 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
87 | Construction of Street Pavement Drains Culverts etc at vc/nc Baghdada 1 District Mardan | 0.9240 | 18480 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
88 | Construction of Street Pavement Drains Culverts etc at vc/nc Kaskorona 3 District Mardan | 0.5000 | 10000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
89 | Construction of Street Pavement Drains Culverts etc at vc/nc Baghdada 2 District Mardan | 1.1370 | 22740 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
90 | Construction of Street Pavement Drains Culverts etc at vc/nc Khanjer District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
91 | Construction of Street Pavement Drains Culverts etc at vc/nc Bakyana District Mardan | 0.4430 | 8860 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
92 | Construction of Street Pavement Drains Culverts etc at vc/nc MArdan Khas 2 District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
93 | Construction of Street Pavement Drains Culverts etc at vc/nc Khazanadheri 1 District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
94 | Construction of Street Pavement Drains Culverts etc at vc/nc Gujaro Garhi 6 District Mardan | 0.3890 | 7780 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
95 | Construction of Street Pavement Drains Culverts etc at vc/nc Saro shah District Mardan | 0.4890 | 9780 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
96 | Construction of Street Pavement Drains Culverts etc at vc/nc Ferozpur District Mardan | 0.7260 | 14520 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
97 | Construction of Street Pavement Drains Culverts etc at vc/nc Jamra District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
98 | Construction of Street Pavement Drains Culverts etc at vc/nc Pat baba 2 District Mardan | 1.5200 | 30400 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
99 | Construction of Street Pavement Drains Culverts etc at vc/nc Pat baba 3 District Mardan | 1.6620 | 33240 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
100 | Construction of Street Pavement Drains Culverts etc at vc/nc Pat baba 1 District Mardan | 1.2850 | 25700 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
101 | Construction of Street Pavement Drains Culverts etc at vc/nc Daman e koh 1 District Mardan | 0.4180 | 8360 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
102 | Construction of Street Pavement Drains Culverts etc at vc/nc Daman e koh 3 District Mardan | 0.3790 | 7580 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
103 | Construction of Street Pavement Drains Culverts etc at vc/nc Narai 2 District Mardan | 0.7000 | 14000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
104 | Construction of Street Pavement Drains Culverts etc at vc/nc Ahmad Abad District Mardan | 0.8000 | 16000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
105 | Construction of Street Pavement Drains Culverts etc at vc/nc Rahmat Abad District Mardan | 0.3000 | 6000 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
106 | Construction of Street Pavement Drains Culverts etc at vc/nc Shahbaig District Mardan | 0.3300 | 6600 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|
107 | Construction of Street Pavement Drains Culverts etc at vc/nc Daman e koh 2 District Mardan | 1.2930 | 25860 |
08-Jun-2020
| 11:30:00 | As per work order | |
Download BOQ
|