Sealed tender for below mentioned works are hereby invited from Govt: Contractors enlisted with LG&RDD/PEC in the relevant category and having registration/enlistment renewal for the current year as per following schedule.

Work NoWork NameEstimated Cost (Millions)Earnest Money(Rs.)Last Date / Time of Submission of Tender FormsDate / Time of OpeningTime LimitAddress of NC / VCDownload BOQ
1Construction of DWSS for Ameer Ullah Khan S/O Payojan Shobi Khel Dwatoi Tehsil Ladha4.146182922 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
2Construction of DWSS for Murad Hussain S/O Dojani Khan Dwatoi Tehsil Ladha4.146182922 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
3Construction of DWSS for Rehan Khan S/O Alam Sher Shobi Khel Dwatoi Tehsil Ladha4.146182922 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
4Construction of Channel at Maqsood Rahman S/O Amir Ullah Shobi Khel Dwatoi Tehsil Ladha4.000080000 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
5Constriction of Street Pavement at Faheem Khan S/O Nazir Ullah Shobi Khel Dwatoi Tehsil Ladha4.556891136 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
6Construction of Street Pavement at Muhammad Rokhan S/O Hazrat Ullah Shobi Khel Dwatoi Tehsil Ladha7.0105140209 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
7Construction of Black Top Road at Main Road to Bilal Kot Sarwakai24.0980481960 13-Dec-2024 2:00PMAs per work orderNIL Download BOQ
  1. Tender form can be filled online and downloaded from the official website of LGE&RDD (www.lgkp.gov.pk)
    after publishing NIT.
  2. The securities shall be in shape of call deposit in favor of the Assistant Director LG&RDD SW Upper,
  3. The contractors quoting their bids up to a limit of 10% below Engineer Estimate shall submit bid security @
    2% only of Engineer Estimate.
  4. The contractors quoting their bids more than 10% below up to 20% below on Engineers’ Estimate shall submit
    along with their bids 8% Additional Security of Engineer's Estimated cost in addition to 2% bid security. If
    the bid is not accompanied with the required amount of additional security, then it will be considered as non-
    responsive and the 2% bid security shall be forfeited in favor of Government and the second lowest bidder and
    so on will be considered accordingly.
  5. Similarly, a contractor, quoting bid more than 20% below shall submit with his bid an additional security on
    Engineer's Estimated cost equal to the differential amount of submitted bid and Engineers' Estimate along
    with detailed rate analysis. In case of more than 20% below bids, if the bid is not accompanied by the detailed
    rate analysis and / or required amount of additional security, then said bid shall be considered as non-
    responsive. All the securities submitted along with such non-responsive bid shall be forfeited in favor of
    Government and the 2nd lowest bidder and so on will be considered accordingly.
  6. In case detailed rate analysis submitted with the bids is, in view of the Procuring Entity, not convincing, the
    Head of the Procuring Entity may declare such bid as non-responsive without any forfeiture of bid securities
    and record reasons thereof.
  7. The procuring entity' may offer the contract to next lowest bidder after due diligence in the context of financial
    difference between such two bids or may advertise procurement opportunity afresh.
  8. Printed Electronic bid (both Original & Duplicate copies) may be delivered through courier service.
  9. The call deposits i.e. bid security for the work / contract must be prepared after publishing of NIT.
  10. The time for completion of scheme shall be as per work order. The contractor or his representative can be
    present at time of opening of electronic bids opening.
  11. In case of tie / draw amongst the responsive bidders, the bid may be decided through free toss which shall be
    considered as final.
  12. Any electronic bidder who provides false, or materially inaccurate or incomplete or do not send information
    in hard form will be disqualified as per KPPRA Act Section 29 (1) read with KPPRA Rule (43). Furthermore,
    the Procuring Entity/Executing Agency will recommend and sent cases for debarring/Blacklisting and will
    initiate / take action in light of approved procedure / mechanism as per KPPRA Act section 29 (2) read with
    KPPRA Rule (44).
  13. Bids will remain valid for 90 days from the closing date of bids.
  14. The firms/contractors who wants to participate in tendering process may approach Directorate General
    LG&RDD Peshawar within two days before closing time of electronic apply for uploading their names on the
    official website i.e. (www.lgkp.uov.pk)
  15. All bidders are required to be registered with Khyber Pakhtunkhwa Revenue .Authority (KPRA) under the
    Khyber Pakhtunkhwa Finance Act 2013.
  16. The PEC and KPRA registration (Active l ax Payer) must be valid for current Financial Year and attached with
    the Electronic Bids.

17. Any addition made in the terms & conditions in NI T advertised shall be implemented as per KPPRA Act &

Rules.

 

 

Assistant Director

LG&RDD SW Upper

NIL

0963-510661