Sealed tender for below mentioned works are hereby invited from Govt: Contractors enlisted with PEC in the relevant category and having registration/enlistment renewal for the current year as per following schedule.

Work NoWork NameEstimated Cost (Millions)Earnest Money(Rs.)Tender Form(Rs.)Required PEC CategoryLast Date / Time of online applyDate / Time of OpeningTime LimitDownload BOQ
1PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT MOHALLAH HAJI ARIFULLAH BARA ROAD PISHTAKHARA PAYAN UC-60 PESHAWAR1.7000340000  2020-04-08 12:00 AM 11:30:00As per issue work order Download BOQ
2SUPPLY / FIXING OF STREET LIGHT AT VARIOUS PLACES LANDI ARBAB AND NOTHIA PAYAN PESHAWAR1.7000340000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
3PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT GULSHAN IQBAL UC-36 PESHAWAR1.7000340000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
4PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT SHAHEED ABAD ETC UC-40 TEKLA BALA3.8000760000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
5CONSTRUCTION OF STREET DRAIN CULVERT AND SIDE WALL UC BAZID KHEL PESHAWAR PK-791.0000200000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
6REPAIR OF EXISTING BUILDING OF TMA TOWN-III OFFICE,PESHAWAR1.5000300000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
7PAVEMENT OF STREET, DRAINS, CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL GHARI SIKANDAR KHAN UC-60 PISHTAKHARA, PESHAWAR.3.2940658800  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
8PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL LANDI AKHUN AHMAD UC-60 PISHTAKHARA, PESHAWAR3.2500650000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
9PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL NODEH PAYAN UC-60 PISHTAKHARA, PESHAWAR3.2750655000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
10PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SHAHEED ABAD UC-60 PISHTAKHARA, PESHAWAR3.2700654000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
11PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL PISHTAKHARA PAYAN UC-60 PISHTAKHARA, PESHAWAR3.2720654400  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
12PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL FAQER ABAD UC-58 SHEIKHAN, PESHAWAR3.2720654400  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
13PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL MUSHTARZAI UC-58 SHEIKHAN, PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
14PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SHEIKHAN UC-58 SHEIKHAN, PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
15PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL PISTHAKHARA BALA UC-59 SARBAND, PESHAWAR3.2500650000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
16PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-1 UC-59 SARBAND, PESHAWAR3.2720654400  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
17PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-2 UC-59 SARBAND, PESHAWAR3.2700654000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
18PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-3 UC-59 SARBAND, PESHAWAR3.3000660000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
19PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-4 UC-59 SARBAND, PESHAWAR3.2720654400  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
20PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL WALI ABAD UC-59 SARBAND, PESHAWAR.3.3000660000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
21PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL ACHINI PAYAN,NODEH BALA AND NAWAB ABAD UC-81 SUFAID DHERI, PESHAWAR.9.80001960000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
22NAME OF WORK:- PAVEMENT OF STREET, DRAINS, CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL DORA AND RAMIZI UC-81 SUFIAD DHERI, PESHAWAR6.58101316200  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
23PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL HAJI BANDA AND BARA QADEEM UC-91 ACHINI BALA, PESHAWAR6.50001300000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
24PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SANGO AND LANDI BALA UC-91 ACHINI BALA, PESHAWAR6.55001310000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
25PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL ACHINI BALA UC-91 ACHINI BALA, PESHAWAR3.2700654000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
26CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- RAHAT ABAD-1, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
27CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- TALARZAI, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
28CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- ATOZAI BALA, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
29CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- ATOZAI PAYAN, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
30CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC MAGHDARZAI BALA UC-41 PALOSI (PK-74) PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
31CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- MAGHDARZAI PAYAN, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
32CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT PALOSI PIRAN, UC-41 PALOSI PESHAWAR3.0000600000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
33CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT MUSALEE GHARI, UC-41 PALOSI PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
34CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC SHAHEEN TOWN-I, UC-37 SHAHEEN TOWN PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
35CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC SHAHEEN TOWN-II, UC-37 SHAHEEN TOWN PESHAWAR3.0000600000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
36CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC GHAREEB ABAD, UC-37 SHAHEEN TOWN PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
37CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC CHARANDA, UC-38 TEHKAL PAYAN-I PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
38CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT BIHARI COLONY UC-38 TEHKAL PAYAN-1PESHAWAR (PK-74)4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
39CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC DAUD ZAI, UC-39 TEHKAL PAYAN-II PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
40CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC MUGHULZAI, UC-39 TEHKAL PAYAN-II PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
41CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC ARBABAN, UC-40 TEHKAL BALA PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
42CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC KANDI RAZA KHAN, UC-40 TEHKAL BALA PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
43CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC KANDI HASSANZAI, UC-40 TEHKAL BALA PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:00:00As per work order Download BOQ
44REPAIR OF TRANSFORMER AT ARBAB ROAD, SHAHEEN TOWN, TEHKAL BALA, TEHKAL PAYAN-I&II PAWAKA PALOSI BABU GARI PK-74 PESHAWAR10.00002000000  2020-04-08 12:00 AM 11:00:00As per work order Download BOQ
45Solarization of Different Masajid (Muhammadi Masjid, Palosi Janazgah, Masjid Hubab, Masjid Rehman, Masjid Koba, Moray Masjid, MadrassaMasjid,Masjid Aqsa, Masjid NoOr,Tehkal Masjid;AI Noor Masjid,Bilal Masjid, Abu bakar Siddiq Masjid, Maki Masjid, Masjid Toheed, Jamblyan Masjid, Miagan Masjid, Meena Masjid,Chishti Masjid,Masjid Ansar) PK-74, Peshawar10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
46SCHEME NAME:- ELECTRIC ACCESSORIES/ SUPPLYING AND FIXING OFSTREET LIGHTS AT DIFFERENT AREAS I.E ARBAB ROAD, SHAHEEN TOWN, TEHKAL PAYAN-I&II, TEHKAL BALA, PALOSI BABU GARI PK-74, PESHAWAR10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
47CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT JANDER GALI, ZIARAT WALI, RIAZ SHAHEED COLONY, GULSHAN COLONY, SHAHEEN COLONY AND UMEED ABAD NOTHIA PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
48CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT DERI BAGHBANAN, UC-32 DERI BAGHBANAN PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
49Construction Of Street / Drain / Culverts / Slab Etc. At Landi Arbab-I & Manakrao Uc-33 Landi Arbab Peshawar4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
50CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT PATHAN COLONY, MUSHTAQ ABD AND NAZEER ABAD, UC-32 DERI BAGHBANAN PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
51CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT SARWAR ABAD AND GULGASHT COLONY, UC-32 DERI BAGHBANAN PESHAWAR4.0000800000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
52REPAIR OF TRANSFORMER AT LANDI ARBAB, NOTHIA JADEED, BAHAN MARI, AND WARD NO.5 PK-75 PESHAWAR10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
53REPAIR OF TRANSFORMER AT NOTHIA QADEEM, DHERI BAGHBANAN, PAWAKA AND WARD NO.4 PK-75 PESHAWAR10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
54Solarization of Masajid, Community Center & Church in Different areas i.e Shehzad Ahmad, Masjid Rizwan, Masjid Bakh Awar Baba, Masjid Gul Zaman, Masjid Bilal, Mmanz Masjid, Masjid Salman Farsi, Masjid Nimra, Masjid Makki, Masjid Noorani, Masjid Nothia, Masjid Hamza, Assembly of God Church Umeed Abad, PK-75 Peshawar.10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
55Electric Accessories in Landi Abab, Nothia Jadeed Nothia Qadeem, Deri Baghbanan, Bhana Marhi Pawaka Ward-4 & Ward-5, PK-75 Peshawar10.00002000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
56PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT UCs PALOSAI, PAWAKA, TEHKAL PAYAN-I,TEHKAL PAYAN-II, REGI, MALKANDHER,SHAHEEN TOWN, UNIVERSITY TOWN,DHERI BAGHBANAN, BANA MARI,NOTHIA JADEED,NOTHIA QADEEM,TEHKAL BALA AND LANDI ARBAB, PESHAWAR30.00006000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
57Name of Work:-Electrification Work/ Repair of Transformers at different U.Cs i.e. palosai, pawaka,tehkal payan-I,tehkal payan-II, regi, malakandher,shaheen town, university town,dheri baghbanan, bana mari,nothia jadeed ,nothia qadeem,tehkal bala, landi arbab,hayatabad-I & II and peshawar cantonment , NA-30,District Peshawar20.00004000000  2020-04-08 12:00 AM 11:30:00As per work order Download BOQ
ٹینڈر میں شرکت کرنے والے خواہشمند ٹھیکیداروں کے لئے چیدہ چیدہ شرائط درج ذیل ہیں۔
(1) ٹینڈر فارم اور بی او کیو (BOQ) محکمہ لوکل کونسل بورڈ (LCB) کی ویب سائٹ (www.lgkp.gov.pk) سے اخبار میں شائع ہونے کے اگلے دن  Download کئے جاسکتے ہیں۔
2) ( ٹینڈر فارم کے ساتھ متعلقہ کام کی زرضمانت2%  (دو فیصد) بشکل کال ڈیپازٹ (Original CDR)  بنامAdministrator/TMO  ٹا ؤن میونسپل ایڈمنسٹریشن ٹاؤن تھری پشاور لگانا لازمی ہے۔
(3) مشروط /ٹیلی گراف و نا مکمل درخواستیں زیر غور نہیں لائی جائیں گی۔
(4) CDR / ایڈیشنل سکیورٹی کی جو انٹری ویب سائٹ میں درج کی جائے اس کے مطابق اور وہی  CDR فارم کے ساتھ لف کرنا لازمی ہے۔ غلط ثابت ہونے پر فارم ڈیفیکٹیو تصور کیا جائے گا۔
(5) فارم کے ساتھ قومی شناختی کارڈ /لائیسنس اور انجینئرنگ کونسل (تصدیق شدہ) کاپیاں منسلک کرنا ضروری ہے۔
(6) ٹینڈر Sealed Covers  میں جس پر متعلقہ کام کا نام اور دیگر مکمل معلومات درج ہوں۔ کورئیر کے ذریعے اوریجنل دفترہذا کو اور اسیطرح ڈوپلیکیٹ کاپی بندلفافے میں دفتر لوکل کونسل بورڈ، خیبر پختونخواہ پشاور کے دفتر کو مقررہ تاریخ تک بھجوانا ہونگی جسکی کورئیرکی اوریجنل رسید ٹینڈر فارم کے ساتھ لگانا لازمی ہوگا۔ نیزایک ہی کور میں بند ایک سے زیادہ ٹینڈرفارم قابل قبول نہیں ہونگے۔
(7) تخمینہ لاگت MRS 2019 کے تحت مرتب کئے گئے ہیں۔لہٰذا ٹھیکیداران/فرمز صوبائی حکومت کی طرف سے جاری شدہ ٹینڈرز کے نئے طریقہ کار بذریعہ چھٹی نمبر SOVI/CMS/KPK/1-13/2016/4264-70  مورخہ 08-04-2016 کو مد نظر رکھ کر اپنے ریٹس Above/Below کی بنیاد پر پیش کریں۔
(8) فرم/ٹھیکیدار کو اپنے ریٹس ہندسوں اور لفظوں میں درج کرنے ہونگے۔ اور عشاریہ کے بعد دو (2) ہندسوں کی شمارہونگی۔ ٹھیکیدار/فرم کا دستخط ٹینڈر فارم/BOQ پر لازمی ہونا چاہئے۔ نہ ہونے کی صورت میں ٹینڈر فارم/BOQ ڈیفکٹیوں (Defective) تصور ہوگا۔
(9) ہر قسم کے میٹریل کی ٹیسٹنگ کے اخراجات انجینئر انچارج کے حکم کے مطابق ٹھیکیدار/فرم کو خود برداشت کرنے ہونگے۔
(10) اگر ٹھیکیدار/فرم انجینئرنگ اسٹیمیٹ  پر 10% سے زیادہ بیلو ریٹ دینا چاہے تواسٹیمیٹ کاسٹ پر 8% زرضمانت بشکل کال ڈیپازٹ مزید ٹینڈر فارم کے ساتھ جمع کروانے کا پابند ہوگا بصورت دیگر ایسے ٹینڈر فارم کو ٹینڈر میں شامل نہیں کیا جائے گا۔
(11) ٹینڈرریٹس برابر ہونے کی صورت میں فیصلہ بذریعہ قرعہ اندازی کیا جائیگا۔ جس کی تاریخ کی اطلاع موقع پر دی جائیگی۔
(12) تمام ٹھیکیدارن /فرمز مروجہ KPPRA رولز کے پابند ہونگے۔
(13) کامیاب ٹینڈر دہندہ حکومت پاکستان کے مروجہ قانون کے تحت تمام ٹیکسز کی ادائیگی کا پابند ہوگا۔
(14) ٹاؤن میونسپل ایڈمنسٹریشن ٹاؤن تھری پشاور کسی قسم کی مشینری / سٹور  فراہم کرنے کا پا بند نہیں ہوگا۔
(15) کامیاب ٹینڈر دہندہ کو ورک آرڈر جاری ہونے پر مقررہ میعاد کے اندر اندرکام پایہ تکمیل تک پہنچانے کا پابند ہوگا۔ تاخیر کی صورت میں ٹھیکیدار قواعد کے مطابق تخمینہ لاگت پر یومیہ کے حساب سے جرمانہ کی ادائیگی کا پابند ہوگا۔
(16)    کامیاب ٹینڈر دہندہ کسی دوسرے شخص کو ٹھیکہ Sublet نہیں کرسکے گا۔
(17) دفتر ہذا کو غلط معلومات/دستاویزات فراہم کرنے پر ٹھیکیدار /فرم کے خلاف قانونی کاروائی عمل میں لائی جائیگی۔
(18) کامیاب ٹھیکیدار کو 15یوم کے اندر اندر محکمہ ہذا کے ساتھ ایگریمنٹ کرنا ہوگا۔ جس میں اب تک کی گئی تمام ترامیم شامل ہوں گی۔
(19) فارم/BOQ میں  Correction/Cutting/ Over Writing کو مسترد تصور کیا جائے گا۔
(20) بحوالہ صوبائی حکومت چھٹی نمبر AO(Planning)/LCB/2-1/General File/2019 مورخہ 26-11-2019،ٹھیکیدار /فرم کاخیبر پختونخواہ ریوینیو اتھارٹی سے رجسٹرڈ ہونا اور ان کا  Active Tax Payer ہونا لازمی ہے۔ نہ ہونے کی صورت میں بڈ/فارم ڈیفیکٹیوتصور کیجائے گی۔
(21) کام کے بارے میں مزید معلومات دفتری اوقات کار میں انجینئرنگ برانچ سے کسی بھی وقت حاصل کی جاسکتی ہیں۔
  (22) سیریل نمبر 57,53,52,44  مرمتی ٹرانسفارمرز (مختلف نوعیت) کے لیے چیدہ چیدہ شرائط پوری کرنی لازمی ہونگی۔ مذکورہ شرائط پر پورا نہ اترنے والے ٹھیکیداران / فرم زحمت نہ کرے۔  
((a  ایسے ٹھیکیدار جو الیکٹرک سٹی (انرجی اینڈ پاؤر)ڈیپارٹمنٹ خیبر پختونخواہ سے کلاس     ؑ"E"کے لائسنس یافتہ ہو۔اور اس کی تجدید 2019-20 کیلئے
ا لیکٹرک سٹی (انرجی اینڈ پاؤر)ڈیپارٹمنٹ خیبر پختونخواہ سے کروائی ہو۔ 
(b) ٹھیکہ میں صرف اور صرف وہ ٹھیکدار / فرم حصہ لے سکتی ہیں جن کی ورکشاپس PESCOکے ساتھ رجسٹرڈ ہوں۔ 
(c)کامیاب ٹھیکیداران کے ساتھ  مختلف نوعیت (varios Capacities)کے سپیئر ٹرانسفارمرز کا موجود ہونا لازمی ہے۔
(d)کامیاب ٹھیکیدار  PESCOکے متعلقہ سب ڈویژن سے تسلی بخش سرٹیفیکیٹ حاصل کرنے کا پابند ہو گا۔
(eکامیاب ٹھیکیدارکنڈم سامان تا ر وغیرہ دفتر ہذا کے سٹور میں جمع کرانے کا پابند ہوگا۔ جمع نہ کرانے کی صورت میں ٹھیکیدار کے ہر بل سے 10  فیصد تک کٹوتی کی جائیگی۔جس کے لئے ٹھیکدار کا کوئی بھی عذر قابل قبول نہیں ہوگا۔    
(23) مقررہ تاریخ کو حکومت کی طرف سے چھٹی کے اعلان کی صورت میں ٹینڈرانہی شرائط پر اس کے اگلے دن کھولے جائینگے۔
نوٹ: ورک آرڈر بعد از فنڈ دستیابی جاری کیے جائینگے۔ 
 