Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT MOHALLAH HAJI ARIFULLAH BARA ROAD PISHTAKHARA PAYAN UC-60 PESHAWAR | 1.7000 | 34000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per issue work order |
Download BOQ
|
2 | SUPPLY / FIXING OF STREET LIGHT AT VARIOUS PLACES LANDI ARBAB AND NOTHIA PAYAN PESHAWAR | 1.7000 | 34000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
3 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT GULSHAN IQBAL UC-36 PESHAWAR | 1.7000 | 34000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
4 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT SHAHEED ABAD ETC UC-40 TEKLA BALA | 3.8000 | 76000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
5 | CONSTRUCTION OF STREET DRAIN CULVERT AND SIDE WALL UC BAZID KHEL PESHAWAR PK-79 | 1.0000 | 20000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
6 | REPAIR OF EXISTING BUILDING OF TMA TOWN-III OFFICE,PESHAWAR | 1.5000 | 30000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
7 | PAVEMENT OF STREET, DRAINS, CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL GHARI SIKANDAR KHAN UC-60 PISHTAKHARA, PESHAWAR. | 3.2940 | 65880 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
8 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL LANDI AKHUN AHMAD UC-60 PISHTAKHARA, PESHAWAR | 3.2500 | 65000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
9 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL NODEH PAYAN UC-60 PISHTAKHARA, PESHAWAR | 3.2750 | 65500 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
10 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SHAHEED ABAD UC-60 PISHTAKHARA, PESHAWAR | 3.2700 | 65400 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
11 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL PISHTAKHARA PAYAN UC-60 PISHTAKHARA, PESHAWAR | 3.2720 | 65440 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
12 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL FAQER ABAD UC-58 SHEIKHAN, PESHAWAR | 3.2720 | 65440 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
13 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL MUSHTARZAI UC-58 SHEIKHAN, PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
14 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SHEIKHAN UC-58 SHEIKHAN, PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
15 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL PISTHAKHARA BALA UC-59 SARBAND, PESHAWAR | 3.2500 | 65000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
16 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-1 UC-59 SARBAND, PESHAWAR | 3.2720 | 65440 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
17 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-2 UC-59 SARBAND, PESHAWAR | 3.2700 | 65400 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
18 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-3 UC-59 SARBAND, PESHAWAR | 3.3000 | 66000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
19 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SARBAND-4 UC-59 SARBAND, PESHAWAR | 3.2720 | 65440 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
20 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL WALI ABAD UC-59 SARBAND, PESHAWAR. | 3.3000 | 66000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
21 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL ACHINI PAYAN,NODEH BALA AND NAWAB ABAD UC-81 SUFAID DHERI, PESHAWAR. | 9.8000 | 196000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
22 | NAME OF WORK:- PAVEMENT OF STREET, DRAINS, CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL DORA AND RAMIZI UC-81 SUFIAD DHERI, PESHAWAR | 6.5810 | 131620 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
23 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL HAJI BANDA AND BARA QADEEM UC-91 ACHINI BALA, PESHAWAR | 6.5000 | 130000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
24 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL SANGO AND LANDI BALA UC-91 ACHINI BALA, PESHAWAR | 6.5500 | 131000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
25 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT VILLAGE COUNCIL ACHINI BALA UC-91 ACHINI BALA, PESHAWAR | 3.2700 | 65400 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
26 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- RAHAT ABAD-1, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
27 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- TALARZAI, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
28 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- ATOZAI BALA, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
29 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- ATOZAI PAYAN, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
30 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC MAGHDARZAI BALA UC-41 PALOSI (PK-74) PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
31 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC- MAGHDARZAI PAYAN, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
32 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT PALOSI PIRAN, UC-41 PALOSI PESHAWAR | 3.0000 | 60000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
33 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT MUSALEE GHARI, UC-41 PALOSI PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
34 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC SHAHEEN TOWN-I, UC-37 SHAHEEN TOWN PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
35 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC SHAHEEN TOWN-II, UC-37 SHAHEEN TOWN PESHAWAR | 3.0000 | 60000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
36 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC GHAREEB ABAD, UC-37 SHAHEEN TOWN PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
37 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC CHARANDA, UC-38 TEHKAL PAYAN-I PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
38 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT BIHARI COLONY UC-38 TEHKAL PAYAN-1PESHAWAR (PK-74) | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
39 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC DAUD ZAI, UC-39 TEHKAL PAYAN-II PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
40 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC MUGHULZAI, UC-39 TEHKAL PAYAN-II PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
41 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC ARBABAN, UC-40 TEHKAL BALA PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
42 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC KANDI RAZA KHAN, UC-40 TEHKAL BALA PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
43 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT VC KANDI HASSANZAI, UC-40 TEHKAL BALA PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:00:00 | As per work order |
Download BOQ
|
44 | REPAIR OF TRANSFORMER AT ARBAB ROAD, SHAHEEN TOWN, TEHKAL BALA, TEHKAL PAYAN-I&II PAWAKA PALOSI BABU GARI PK-74 PESHAWAR | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:00:00 | As per work order |
Download BOQ
|
45 | Solarization of Different Masajid (Muhammadi Masjid, Palosi Janazgah, Masjid Hubab, Masjid Rehman, Masjid Koba, Moray Masjid, MadrassaMasjid,Masjid Aqsa, Masjid NoOr,Tehkal Masjid;AI Noor Masjid,Bilal Masjid, Abu bakar Siddiq Masjid, Maki Masjid, Masjid Toheed, Jamblyan Masjid, Miagan Masjid, Meena Masjid,Chishti Masjid,Masjid Ansar) PK-74, Peshawar | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
46 | SCHEME NAME:- ELECTRIC ACCESSORIES/ SUPPLYING AND FIXING OFSTREET LIGHTS AT DIFFERENT AREAS I.E ARBAB ROAD, SHAHEEN TOWN, TEHKAL PAYAN-I&II, TEHKAL BALA, PALOSI BABU GARI PK-74, PESHAWAR | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
47 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT JANDER GALI, ZIARAT WALI, RIAZ SHAHEED COLONY, GULSHAN COLONY, SHAHEEN COLONY AND UMEED ABAD NOTHIA PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
48 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT DERI BAGHBANAN, UC-32 DERI BAGHBANAN PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
49 | Construction Of Street / Drain / Culverts / Slab Etc. At Landi Arbab-I & Manakrao Uc-33 Landi Arbab Peshawar | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
50 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT PATHAN COLONY, MUSHTAQ ABD AND NAZEER ABAD, UC-32 DERI BAGHBANAN PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
51 | CONSTRUCTION OF STREET , DRAIN, CULVERT AND SIDE WALL AT SARWAR ABAD AND GULGASHT COLONY, UC-32 DERI BAGHBANAN PESHAWAR | 4.0000 | 80000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
52 | REPAIR OF TRANSFORMER AT LANDI ARBAB, NOTHIA JADEED, BAHAN MARI, AND WARD NO.5 PK-75 PESHAWAR | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
53 | REPAIR OF TRANSFORMER AT NOTHIA QADEEM, DHERI BAGHBANAN, PAWAKA AND WARD NO.4 PK-75 PESHAWAR | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
54 | Solarization of Masajid, Community Center & Church in Different areas i.e Shehzad Ahmad, Masjid Rizwan, Masjid Bakh Awar Baba, Masjid Gul Zaman, Masjid Bilal, Mmanz Masjid, Masjid Salman Farsi, Masjid Nimra, Masjid Makki, Masjid Noorani, Masjid Nothia, Masjid Hamza, Assembly of God Church Umeed Abad, PK-75 Peshawar. | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
55 | Electric Accessories in Landi Abab, Nothia Jadeed Nothia Qadeem, Deri Baghbanan, Bhana Marhi Pawaka Ward-4 & Ward-5, PK-75 Peshawar | 10.0000 | 200000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
56 | PAVEMENT OF STREETS,DRAINS,CULVERTS AND SIDE WALLS ETC AT UCs PALOSAI, PAWAKA, TEHKAL PAYAN-I,TEHKAL PAYAN-II, REGI, MALKANDHER,SHAHEEN TOWN, UNIVERSITY TOWN,DHERI BAGHBANAN, BANA MARI,NOTHIA JADEED,NOTHIA QADEEM,TEHKAL BALA AND LANDI ARBAB, PESHAWAR | 30.0000 | 600000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|
57 | Name of Work:-Electrification Work/ Repair of Transformers at different U.Cs i.e. palosai, pawaka,tehkal payan-I,tehkal payan-II, regi, malakandher,shaheen town, university town,dheri baghbanan, bana mari,nothia jadeed ,nothia qadeem,tehkal bala, landi arbab,hayatabad-I & II and peshawar cantonment , NA-30,District Peshawar | 20.0000 | 400000 | 0 | |
2020-04-08 12:00 AM
| 11:30:00 | As per work order |
Download BOQ
|