Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | INSTALLATION OF TUBE WELL BORE ALI AKBAR KOROONA WITH SOLAR SYSTEM VC KAKA KHEL UC TATTA | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
2 | NAME OF PROJECT: INSTALLATION OF TUBE WELL BORE AQEEL KHAN KOROONA DEPTH WITH SOLAR SYSTEM VC KIRRI UMER KHAN UC Tatta | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
3 | INSTALLATION OF TUBE WELL BORE HAKIM KHAN KOROONA WITH SOLAR SYSTEM VC CHESAN KATCH UC TATTA | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
4 | INSTALLATION OF TUBE WELL BORE HAYAT KHAN KOROONA WITH SOLAR SYSTEM VC UC SHAH ALA | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
5 | INSTALLATION OF SOLAR SYSTEM AT TANK PRESS CLUB TANK CITY
| 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
6 | DRESSING OF LANDS, REMOVAL OF GARBAGE AND REMOVAL OF BUSHES AT UC SHAH ALAM | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
7 | :CONSTRUCTION OF 1 NO WATER TANK (150000) & 1 NO SOLAR BORE (350000) TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
8 | INSTALLATION OF 1 NO WATER TANK 1 NO PRESSURE PUMP CO ZAFRAN TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
9 | INSTALLATION OF PRESSURE PUMP C/O HAJI FATEH WITH SOLAR SYSTEM VC MANZAI UC TATTA | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
10 | INSTALLATION OF PRESSURE PUMP JAMEEL KOT GULAN UC TATTA | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
11 | CONSTRUCTION OF A CULVERT C/O FAROOQ ZAMAN MITHU UC JATTATR | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
12 | CONSTRUCTION OF A CULVERT C/O ABDUR RAHIM MALILK UC RANWAL | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
13 | Installation of Solar System at Baramid koroona Upper Manzai | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
14 | INSTALLATION OF 2 NO SOLAR C/O GHULAM MANI UC DABBARA | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
15 | CONSTRUCTION OF PCC STREET VILLAGE MARMA CO SAIF UR REHMAN SO SHAH JAHAN UC RANWA | 0.4500 | 9000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
16 | CONSTRUCTION OF 1 NO WATER TANK QARI ABDUL LATIF VILLAGE MARMA UC RANWAL | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
17 | CONSTRUCTION OF 1 NO WATER TANK QARI ABDUR RAZZAQ VILLAGE MARMA UC RANWAL | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
18 | CONSTRUCTION OF NOOR ZAMAN STREET 100FT VILLAGE MARMA UC RANWAL | 0.4500 | 9000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
19 | CONSTRUCTION OF 1 NO WATER TANK SAID AKBAR VILLAGE MARMA UC RANWAL | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
20 | QAYOOM KALI WANDA GARAH AZMI 2 NO;S SOLAR PRESSURE PUMP UC SHAH ALA | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
21 | INSTALLATION OF PIPE LINE GARAH AZMI TORAN TO GARAH KHANOON CONNECTIVITY UC SHAH ALA | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
22 | CONSTRUCTION OF BOUNDARY WALL MOLVI SHARIF UD DIN MADRASSA TAJORI UC PAI | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
23 | INSTALLATION OF SOLAR SOBAT KHAN CHESAN KACH UC TATTA | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
24 | INSTALLATION OF SOLAR BORE AMAN ULLAH CHESAN KATCH UC TATTA | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
25 | CONSTRUCTION OF STREET WITH DRAIN ZARD ALI VC AKBARI C/O GUL REHMAN UC GUL IMAM | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
26 | CONSTRUCTION OF A DRAIN MISSAL KHAN BALOCH C/O GUL REHMAN UC GUL IMAM | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
27 | INSTALLATION OGF PRESSURE PUMP FAZAL RAHIM WAZNDZALU UC PAI | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
28 | CONSTRUCTION OF A CULVERT & INSTALLATION OF SOLAR C/O SHAREEF VILLAGE CHADRD UC JATTATR | 1.4000 | 28000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
29 | CONSTRUCTION OF KACHHA PROTECTION BUND C/O IRFAN ULLAH S/O GUL BADSHAH TANDAAN UC WARRASPOON | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
30 | INSTALLATION OF PRESSURE PUMP NIAZ AMIN KIRRI LATTI UC TATTA | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
31 | CONSTRUCTION OF A PROTECTION BUND VILLAGE TOURAN UC SHAH ALAM | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
32 | CONSTRUCTION OF A PROTECTION BUND CO IKRAM ULLAH UC RANWAL | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
33 | CONSTRUCTION OF 2 NO CULVERTS VILLAGE TEARI MALOOK C/O MALIK AKHTAR RANWAL UC RANWAL | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
34 | CONSTRUCTION OF PCC STREET SULTAN MUHAMMAD UC RANWAL | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
35 | CONSTRUCTION OF PCC STREET GOMAL TURN TO RAGHZA C/O MOLANA NADIR KHAN UC GOMAl | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
36 | CONSTRUCTION OF BOUNDARY WALL OF EXISTING TUBE WELL AT MAMDU GULU UC GUL IMAM | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
37 | CONSTRUCTION OF A ROOM MUNTAZIR BHITTANI C/O SHOUKAT ADVOCATE KOT GULAN UC TATTA | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
38 | CONSTRUCTION OF A WELL C/O BAHADUR AT UC DABBARA | 0.2500 | 5000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
39 | CONSTRUCTION OF A WELL CO HAZRAT AT UC DABBARRA | 0.2500 | 5000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
40 | CONSTRUCTION OF A DRAIN C/O BAHADUR UC DABBARRA | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
41 | INSTALLATION OF A BORE WITH SOLAR SYSTEM AT UC DABBARR | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
42 | INSTALLATION OF HAND PUMP, PRESSURE PUMP, SUBMERSIBLE PUMP AT DIFFERENT UC’S OF DISTRICT TAN | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
43 | CONSTRUCTION OF 15 NO'S WATER TANKS C/O MOLVI MUSHTAQ IN DIFFERENT UC'S OF TANK | 3.0000 | 60000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
44 | INSTALLATION OF 2 NO PRESSURE PUMP TANVEER KOROONA KIRRI HAIDER UC WARRASPOON | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
45 | INSTALLATION OF PRESSURE PUMP C/O ARSALAN AND SHAYAN KIRRI HAIDER UC WARRASPOO0 | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
46 | INSTALLATION OF SOLAR SYSTEM AT EXISITING BORE C/O HAJI REHMAN VC M AKBAR UC PAI | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
47 | CONSTRUCTION OF 1 NO WATER TANK FOR GHALIB KOORUNA UC DABBARA | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
48 | INSTALLATION OF SOLAR SYSTEM C/O FALAK NAZ TANK CITY | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
49 | INSTALLATION OF 1 NO TUBE WELL WITH SOLAR C/O AZIZ ULLAH UC MULAZAI | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
50 | INSTALLATION OF TUBE WELL AMJAD KHAN KOROONA MULAZAI | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
51 | INSTALLATION OF SUBMERSIBLE BORE WITH SOLAR C/O MOLANA HAZRAT SHAH UC TATTA | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
52 | CONSTRUCTION OF A ROOM FRO JAMIA KHULAIFIA RASHDEEN VILLAGE MUHAMMAD AKBAR UC PAI | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
53 | INSTALLATION OF BORE C/O SHER AZAM VILLAGE AZAM ABAD UC AMA KHE | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
54 | INSTALLATION OF BORE C/O GULISTAN KUNDI MUMREZ UC GUL IMAM | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
55 | INSTALLATION OF PIPE LINE C/O MUFTI SAIF ULLAH 4” DIA UC UTTAR | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
56 | :INSTALLATION OF SOLAR VILLAGE SHADI KHEL UC MULAZAI | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
57 | CONSTRUCTION OF 3 NOS CULVERT C/O ZAHIR SHAH KIRII HAIDER UC WARRASPOO | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
58 | INSTALLATION OF PRESSURE PUMP C/O MALIK REHAN MAGHZAI UC WARRASPOON | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
59 | INSTALLATION OF PRESSURE PUMP WITH SOLAR FAHEEM KALI WANDA UC SHAH ALAM | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
60 | CONSTRUCTION OF WATER TANKS C/O ZIA UD DIN VILLAGE SHADI KHEL UC MULAZAI | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
61 | INSTALLATION OF PRESSURE PUMP C/O ISRAEL uc WARRASPOON | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
62 | :INSTALLATION OF PRESSURE PUMP C/O HAJI HIKMAT UC WARRASPOON | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
63 | :INSTALLATION OF PRESSURE PUMP C/O DOCTOR UBAID UC WARRASPOON | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
64 | INSTALLATION OF PRESSURE PUMP C/O HAJI HIKMAT UC WARRASPOON | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
65 | INSTALLATION OF PRESSURE PUMP C/O FIDA UC WARRASPOON | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
66 | CONSTRUCTION OF MAIN STREET KIRRI LATTI C/O GULISTAN UC TATTA | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
67 | :INSTALLATION OF PRESSURE PUMP WITH SOLAR C/O OF MOLANA JALIL SHAH VILLAGE AKBARI UC PAI | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
68 | INSTALLATION OF PRESSURE PUMP WITH SOLAR C/O AMEER NAWAZ VILLAGE AKBARI UC PAI | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
69 | INSTALLATION OF PRESSURE PUMP WITH SOLAR C/O HAZRAT ALI VILLAGE AKBARI UC PAI | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
70 | INSTALLATION OF PRESSURE PUMP MUHAMMAD SHAH KIRRI HAIDER UC PA | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
71 | INSTALLATION OF PRESSURE PUMP MOLANA NAHID KIRRI HAIDER UC PAI | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
72 | INSTALLATION OF PRESSURE PUMP FAYYAZ KIRRI HAIDER UC PAI | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
73 | INSTALLATION OF PRESSURE PUMP C/O ASGHAR BAZAI & SHOUKAT BAZAI UC TATTA | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
74 | INSTALLATION OF PRESSURE PUMP C/O ASGHAR BAZAI & SHOUKAT BAZAI UC TATTA | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
75 | CONSTRUCTION OF 6 NO WATER TANKS CO SHAMS U ZAMA CITY 2 | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
76 | CONSTRUCTION OF 6 NO WATER TANKS C/O MAULANA IKRAM UC GOMAL | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
77 | CONSTRUCTION OF 6 NO WATER TANKS C/O MAULANA MANZOOR AHMAD UC SARANGZUNA | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
78 | CONSTRCUTION OF 6 NO’S WATER TANK C/O MOLANA HALEEM SHAH UC DABBARA | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
79 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MUFTI SAIF ULLAH UC SHEIKH UTTA | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
80 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MOLANA MUHAMMAD NOOR UC TATTA | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
81 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MOALAN NAVEES UC WARRASPOON | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
82 | CONSTRUCTION OF 6 NO’S WATER TANK C/O haji shahid rasool Jattatr | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
83 | CONSTRUCTION OF 6 NO’S WATER TANK C/O QARI MOLANA HABIB ULLAH UC RANWAL | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
84 | CONSTRUCTION OF 6 NO’S WATER TANK CO HAJI SHAREED UC SHAH ALAM | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
85 | CONSTRUCTION OF 6 NO’S WATER TANK CO QARI RIAZ UC GARAH BALOCH | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
86 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MUFTI SAIF ULLAH UC GUL IMAM | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
87 | CONSTRUCTION OF 6 NO’S WATER TANK C/O HAJI REHMAN UC AMMA KHEL | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
88 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MOLANA SAEED AHMAD UC PAI | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
89 | CONSTRUCTION OF 6 NO’S WATER TANK C/O MOLANA NIZAM UD DIN UC MULAZAI | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
90 | CONSTRUCTION OF 4 NO’S WATER TANK C/O AMEER MUHAMMAD JAN & MOLANA NADIR KHAN UC TANK | 0.6250 | 12500 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
91 | :DWSS ZAREEF KOROONA VILLAGE BAB KHEL UC MULAZAI | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
92 | DWSS MIR SARDAR VILLAGE CHEESAN KATCH UC TATTA | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
93 | CONSTRUCTION OF MAIN DRAIN NEAR NADRA OFFICE 130FT C/O REHMAT IQBAL TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
94 | CONSTRUCTION OF SAKHI ABAD STREET C/O SANAM GUL TANK CITY | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
95 | CONSTRUCTION OF DRAIN BARKI ABAD C/O IQBAL TANK CITY | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
96 | INSTALLATION OF 6” PIPE LINE TANK CITY | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
97 | CONSTRUCTION OF STREET 250FT C/O KAMRAN TANK CITY | 0.3500 | 7000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
98 | INSTALLATION OF PIPE LINE C/O INAM BARKI 6” DIA TANK CITY | 0.6500 | 13000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
99 | CONSTRUCTION OF 1200FT PCC STREET C/O INAM BURKI TANK CITY | 1.6000 | 32000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
100 | INSTALLATION OF PIPE LINE 4” I/D C/O DILAWAR MOHALLA MASOODAN TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
101 | CONSTRUCTION OF 1 NO CULVERT C/O SAID GUL TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
102 | INSTALLATION OF 8” DIA PIPE LINE STATION ROAD 4000FT TANK CITY | 2.3000 | 46000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
103 | INSTALLATION OF PIPE LINE FROM MAIN ROAD TO BASTI PHUL SHAH 3000FT 4” DIA TANK CITY | 0.6500 | 13000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | |
Download BOQ
|
104 | INSTALLATION OF PIPE LINE FROM STATION ROAD TO GANDAPUR MASJID 2000FT 4” DIA TANK CITY | 0.4500 | 9000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | |
Download BOQ
|
105 | INSTALLATION OF 6” DIA PIPE BARKI ABAD 1500FT TANK CITY | 0.6500 | 13000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
106 | SAKHI ABAD TO STATION ROAD TO GRID STATION 3000FT 6” I/D & 4” I/D 1000FT TANK CITY | 1.4000 | 28000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
107 | STATION ROAD TO FAIZULLAH 4000FT 4” DIA TANK CITY | 0.8500 | 17000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
108 | INSTALLATION OF 4” DIA PIPE LINE MADRASSA MASJID QUTAB COLONY 1000FT TANK CITY | 0.2500 | 5000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
109 | CONSTRUCTION OF 700FT PCC STREET C/O HAJI IMRAN TANK CITY | 0.9500 | 19000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
110 | CONSTRUCTION OF PCC STREET 700FT C/O QADEER BARKI TANK CITY | 0.9500 | 19000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
111 | INSTALLATION OF PIPE LINE CIVIL LINE 4”DIA 1000FT C/O MOLANA ILYAS, MUHAMMAD RAMZAN ARAIN TANK CITY | 0.2500 | 5000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
112 | INSTALLATION OF PIPE LINE C/O AZMAT 500FT 3”DIA TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
113 | INSTALLATION OF PIPE LINE C/O TARIQ BARKI 4: DIA 2500FT TANK CITY | 0.5500 | 11000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
114 | CONSTRUCTION OF 1 NO CULVERT C/O SHOUKAT ARMANI NEAR TABLEEGHI MARKAZ TANK CITY | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
115 | CONSTRUCTION OF WATER POND MUMRAIZ C/O UMER KUNDI UC GUL IMAM | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
116 | :DE- SILTING OF WATER PONDS AT UMER ADDA TANK | 10.0000 | 200000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
117 | INSTALLATION OF STREET LIGHT TANK CITY | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
118 | CONSTRUCTION OF PCC DRAIN MADINA COLONY C/O SHAREEF ULLAH TANK CITY
| 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
119 | CONSTRUCTION OF SHINGLE STREET AND 2 NO’S PIPE CULVERTS C/O AMIR ULLAH PIR KATCH TANK CITY | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
120 | :CONSTRUCTION OF 300 FT PCC STREET SAKHI ABAD TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
121 | INSTALLATION OF PRESSURE PUMP C/O ADAM KHAN TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
122 | :INSTALLATION OF PIPE LINE KHAN BARKI 3” DIA 400FT C/O HIDAYAT BURKI TANK CITY | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
123 | :INSTALLATION OF PRESSURE PUMP AT ALI SHER TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
124 | CONSTRUCTION OF WATER TANK CO SAID GUL TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
125 | :INSTALLATION OF PRESSURE PUMP HAJI IMRAN ARAIN QUTAB COLONY TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
126 | CONSTRUCTION OF PCC REHMAT ALI KOROONA UC AMA KHEL
| 0.7500 | 15000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
127 | RENOVATION OF STREET MOHALLA WAZIR ABAD LIAQAT ALI KHAN KOROONA TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
128 | :INSTTATION OF 800FT PIPE LINE 3” I/D MAIN BAZAR TRAFFIC POINT TO PASMARJAN KOROONA MOHALL MAHSOODAN TANK | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
129 | CONSTRUCTION OF 300 FT PCC STREET C/O HIDAYAT BARKI MOHALLA CIVIL LINE TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
130 | CONSTRUCTION OF PCC STREET C/O NASEER TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
131 | CONSTRUCTION OF WATER TANK C/O SAID BAD SHAH PRESS CLUB UC AMA KHEL | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
132 | INSTALLATION OF 4” DIA PIPE LINE MOHALLA PHUL SHAH 1000FT TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
133 | CONSTRUCTION OF PCC STREET SABIR ABAD MASJID BEEBIAAN WALI MOHALLA SHEIKHAN WALA TANK CITY | 1.1000 | 22000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
134 | CONSTRUCTION OF MAIN DRAIN CHAKKAR GHARBI C/O SAID UMAR & ADNAN BURKI TANK CITY | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
135 | CONSTRUCTION OF MAIN DRAIN SHARKI BAHADUR DUKANDAR TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
136 | :IINSTALLATION OF PRESSURE PUMP AT MOHALLA SHEIKHAN WALA SABIR ABAD TANK | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
137 | :INSTALLATION OF PRESSURE PUMP MOHALLA SHEIKHAN WLA GALI GHS NO 1 TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
138 | INSTALLATION OF PRESSURE PUMP AHMAD GUL KOROONA UC DABBARA | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
139 | :INSTALLATION OF PRESSURE PUMP KAMRAN KOROONA KORRO KHAN UC GARRA BALOCH | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
140 | :CONSTRUCTION OF PCC STREET 300FT QAZIAN WALI UC GARAH BALOCH | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
141 | CONSTRUCTION OF PCC STREET SABIR ABAD C/O SHAH FAHAD TANK CITY | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
142 | CONSTRUCTION OF PCC STREET C/O SHAFIQUE UC GUL IMAM | 0.7500 | 15000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
143 | CONSTRUCTION OF PCC STREET NOOR BAKHSH KOOCHA TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
144 | CONSTRUCTION OF PCC STREET REHMAT ALI KOOCHA TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
145 | CONSTRUCTION OF PCC STREET SHAMS MEHSUD 600FT WITH DRAIN TANK CITY | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
146 | :INSTALLATION OF 1 NO PRESSURE PUMP AT GUL IMAM C/O RASHEED S/O SABZ ALI UC GUL IMAM | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
147 | CONSTRUCTION OF 6 NO CULVERTS AND 1 NO 1000FT PCC STREET AT SHAHBAZ UC RANWAL | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
148 | CONSTRUCTION OF PCC STREET SHIREEN UC SHAH ALAM | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
149 | INSTALLATION OF TUBE WELL NEAR JAHAZ GROUND
| 7.0000 | 140000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
150 | INSTALLATION SOLAR SUBMERSIBLE PUMP C/O MUHAMMAD IQBAL KOROONA MOHALLA JABAR KHEL CHESEAN KATCH UC TATTA | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
151 | INSTALLATION OF SOLAR SUBMERSIBLE PUMP C/O NAJIB ULLAH KOROONA UC MULAZAI
| 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
152 | INSTALLATION OF PRESSURE PUMP KHURSHEED COLONY C/O BASHEER TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
153 | :CONSTRUCTION OF PCC STREET C/O USMAN ARAIN TANK CITY | 0.7000 | 14000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
154 | :CONSTRUCTION OF PCC STREET 300RFT C/O NOOR ZAMAN GARAH SHABAZ UC RANWAL | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
155 | :CONSTRUCTION OF PCC STREET 600FT C/O SHOAIB QASAB TANK CITY | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
156 | :CONSTRUCTION OF PCC STREET C/O HAJI PERVEZ CHICHI FAQEER TANK CITY | 0.9500 | 19000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
157 | :CONSTRUCTION OF PCC STREET C/O M ARIF, ABDUR RAUF, M RAEES MOHALLA MALIK RABNAWAZ GARAH SHABAZ UC RANWAL | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
158 | INSTALLATION OF PRESSURE PUMP C/O MUHAMMAD AMJAD S/O ABDUL KHANAN KOROONA BAZAI UC TATTA | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
159 | RENOVATION OF 2 ROOMS IN TMA TANK OLD OFFICE | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
160 | INSTALLATION OF PRESSURE PUMP GHAFOOR SHAH GARAH AZMI WITH SOLAR UC SHAH ALAM
| 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
161 | INSTALLATION OF PRESSURE PUMP GHAFOOR SHAH GARAH AZMI WITH SOLAR UC SHAH ALAM
| 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
162 | :INSTALLATION OF PRESSURE PUMP HAJI spin khan NASAR KHEL GARAH AZMI WITH SOLAR UC SHAH ALAM
| 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
163 | :INSTALLATION OF SOLAR SUBMERSIBLE PUMP PAI C/0 ABDUR REHMAN UC PAI
| 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
164 | CONSTRUCTION/REPAIR OF BOUNDARY WALL STATION ROAD RESERVOIR, NEAR TABLEEGHI MARKAZ RESERVOIR TANK CITY | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
165 | CONSTRUCTION OF 4 NO;S CHAMBER ROOMS AT UMER ADDA FOR EXISTING TUBE WELLS OF TMA TANK | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
166 | CONSTRUCTION OF BOUNDARY WALL AT GARAH BHUDHA TUBE WELL C/O IBRAR
| 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
167 | :INSTALLATION OF PRESSURE PUMP AND WATER TANK C/O FAYYAZ TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
168 | CONSTRUCTION OF PCC STREET 700FT AND CONSTRUCTION OF WATER TANK AND INSTALLATION OF PRESSURE PUMP C/O HAJI ZAMAN TANK CITY | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
169 | iNSTALLATION OF RCC PIPE 18” I/D NEAR GARAH BALOCH | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
170 | :CONSTRUCTION OF 1 NO WATER TANK C/O MASROOR QABAR WALI GALI TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
171 | RECONSTRUCTION/REPAIR OF STREET MOHALL WAZIR ABAD TANK CITY | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
172 | DWSS KHAN RASOOL AND IQBAL KOROONA WAZIR ABAD TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
173 | :INSTALLATION OF SOLAR AT MANI KHAN KOROONA UC MULAZAI
| 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
174 | INSTALLTION OF PRESSURE PUMP C/O NADEEM QUTAB COLONY TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
175 | DWSS Mumrez Pathan | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
176 | INSTALLATION OF PRESSURE PUMP C/O NAZAR KHAN S/O SAHIB JAN KOROONA UC TATTA | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
177 | :INSTALLATION PRESSURE PUMP C/O ALI JAN S/O ZALAY KHAN KANAZAI UC TATTA | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
178 | INSTALLATION OF 3” I/D PIPE LINE 1000FT FAIZ ULLAH COLONY TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
179 | :CONSTRUCTION OF WATER TANK MOHALLA WAZIR ABAD C/O SHERPAO MEHSUD TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
180 | :CONSTRUCTION OF WATER TANK C/O SAJID ALI MOHALLA SHEIKHAN WALA TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
181 | :DWSS ATTA ULLAH KOROONA TANK CITY | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
182 | :INSTALLATION OF PRESSURE PUMP C/O AMEER GHARBI CHAKKAR TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
183 | INSTALLATION OF PRESSURE PUMP C/O BARKAT ULLAH ILAHI ABAD TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
184 | CONSTRUCTION OF JANAZAGAH VILLAGE TOURAN C/O HIDAYAT UC SHAH ALAM | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
185 | :CONSTRUCTION OF PCC STREET KOT ABDUL JABBAR BOLTAN ABAD UC GARAH BALOCH | 2.0000 | 40000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
186 | :INSTALLATION OF PRESSURE PUMP C/O ZAHID ARAIN TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
187 | :INSTALLATION OF PRESSURE PUMP C/O SAQIB TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
188 | INSTALLATION OF PRESSURE PUMP C/O ARSALAN/SO M YOUSUF TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
189 | :INSTALLATION OF PRESSURE PUMP C/O M USMAN S/O AKHTAR TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
190 | :INSTALLATION OF PRESSURE PUMP C/O M BILAL S/O GUL NAWAZ TANK CITY | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
191 | :INSTALLATION OF 1 NO PRESSURE PUMP YAR MUHAMMAD KOROONA UC GARHA BALOCH BANNU ROAD UC GARAH BALOCH | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
192 | :INSTALLATION OF 1 NO PRESSURE PUMP ASFAND YAR UC GARHA BALOCH BANNU ROAD UC GARA BALOCH | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
193 | :INSTALLATION OF 1 NO PRESSURE PUMP NOOR ALI KHAN UC GARHA BALOCH BANNU ROAD UC GARAH BALOCH | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
194 | :INSTALLATION OF 1 NO PRESSURE PUMP SHABIR KHAN UC GARHA BALOCH BANNU ROAD UC GARA BALOCH | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
195 | :CONSTRUCTION OF 1 NO WATER TANK CO ZUBAIR KHAN TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
196 | CONSTRUCTION OF 1 NO WATER TANK C/O RAFIQ ALAM TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
197 | CONSTRUCTION OF 1 NO WATER TANK C/O SHAHZEB KHAN TANK CITY | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
198 | CONSTRUCTION OF 1 NO WATER TANK C/O JAVED QURESHI TANK CITY | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
199 | CONSTRUCTION OF 1 NO WATER TANK C/O AMEER MUHAMMAD JAN TANK CITY | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
200 | :INSTALLATION OF PRESSURE PUMP C/O MOLVI ATTA UR REHMAN UC MULAZAI | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
201 | :INSTALLATION OF PRESSURE PUMP C/O MUSA KHAN NEAR BHATTA UC MULAZAI | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
202 | :P/I OF PIPE LINE IN WAZIR ABAD 3”I/D C/O SADDAM HUSSAIN 2000RFT TANK CITY | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
203 | :P/I OF 3” I/D PIPE LINE IN CIVIL LINE 850RFT TANK CITY | 0.3000 | 6000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
204 | P/I OF 6” ID PVC PIPE LINE IN CIVIL LINE tank city | 0.6000 | 12000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
205 | :INSTALLATION OF PRESSURE PUMP PIRWANA MADRASSA C/O SYED TAHIR SHAH TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
206 | CONSTRUCTION OF PCC DRAIN NEAR GHARBI CHAKKR TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
207 | CONSTRUCTION OF PCC STREET C/O ABDUL QAYOOM BARKI TATOOR ROAD TANK CITY | 0.2200 | 4400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
208 | :INSTALLATION OF PRESSURE PUMP C/O AMAN ULLAH, SHAH PHUL ETC KIRRI HAIDER WARRASPOON | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
209 | INSTALLATION OF PRESSURE PUMP AT DIFFERENT UC’S OF TEHSIL AREA TANK | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
210 | :CONSTRUCTION OF BARAMDA MOSQUE HAIDER E QARAR QUTAB COLONY TANK CITY | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
211 | INSTALLATION OF PRESSURE GHULAM ABBAS MOHALLA HAIDER KHAN TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
212 | :INSTALLATION OF PRESSURE PUMP C/OM HANIF MOHALLA KHURDRIAN WAL TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
213 | :INSTALLATION OF PRESSURE PUMP C/O AKBAR GHARBI CHAKKER TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
214 | CONSTRUCTION OF PCC STREET WALI JAN C/O GOHAR ZAMAN MOHALLA QASABAN TANK CITY | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
215 | EXCAVATION AT LAND OF MALIK NIMAT ULLAH KOT KAT SHAH ALAM | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
216 | INSTALLATION OF SOLAR SYSTEM AT MALIK GOHAR ZAMAN EXISTING BORE UC SHAH ALAM
| 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
217 | INSTALLATION OF PRESSURE PUMP FAHIM GANDAPUR S/O MUHAMMAD RAFIQ VILLAG AZMI SHAHALAM
| 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
218 | CONSTRUCTION OF STREET MOHALLA GOLKURAI GARAH SHAHBAZ | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
219 | CONSTRUCTION OF PCC STREET HAJI KHAN ZALA QUTAB COLONY TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
220 | :INSTALLATION OF PRESSURE PUMPS AT TEHSIL AREA TANK | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
221 | :INSTALLAION OF PRESSURE PUMPC/O RASHEED ARAIN UC SHAH ALAM | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
222 | :INSTALLAION OF PRESSURE PUMP C/O AMAN ULLAH S/O AKBAR ZAMAN KOT KAT UC SHAH ALAM | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
223 | CONSTRUCTION OF WATER TANK C/O YAQOOB S/O IBRAHIM UC GUL IMAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
224 | CONSTRUCTION OF WATER TANK C/O GUL ASLAM S/O ZAREEF KHAN ABI ZAR UC PAI | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
225 | INSTALLATION OF TUBE WELL C/O FARMAN ULLAH MULAZAI TANK | 4.0000 | 80000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
226 | INSTALLATION OF TUBE WELL C/O FAREED ULLAH TANK CITY
| 4.0000 | 80000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
227 | CONSTRUCTION OF 500FT PCC STREET STATION ROAD NEAR IN FRONT OF ROYAL MARRIAGE HALL C/O MUHAMMAD NAWAZ NAZAR KHEL TANK CITY | 0.7500 | 15000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
228 | INSTALLATION OF PRESSURE C/O QAIZAR KHAN VILLAGE KANZAI MANZAI UC | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
229 | INSTALLATION OF SUBMERSIBLE BORE WITH WATER TANK CO IRFAN ULLAH SO ABDULLAH KHAN BHITTANI UC WARRASPOON | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
230 | :CONSTRUCTION OF WATER TANK AT QAYOOM KUNDI HOUSE WITH BORE VILLAGE M AKBAR UC PAI | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
231 | :CONSTRUCTION OF 1 NO CULVERT VILLAGE ADAM ABAD GARAH BUDHA C/O RIZWAN BALOCH UC JATATAR | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
232 | :INSTALLATION OF 2 NO’S PRESSURE PUMP C/O BARKAT ULLAH AND JAMSHID GARAH BUDHA JATTATR | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
233 | CONSTRUCTION OF PCC STREET M ALI KOROONA UC MULAZAI | 5.0000 | 100000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
234 | CONSTRUCTION OF WATER TANK C/O INAYAT TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
235 | INSTALLATION OF PRESSURE PUMP C/O MUAHMMAD KUNDI AMAKHEL | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
236 | INSTALALTION OF PRESSURE PUMP C/O IRFAN AND ALLAH NAWAZ TANK CITY | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
237 | :CONSTRUCTION OF JANAZAGAH C/O HAJI SAAD ULLAH GARAH BALOCH | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
238 | CONSTRUCTION OF STREET MOHALLA FAIZ ULLAH C/O FAHAD KHAN TANK CITY | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
239 | : CONSTRUCTION OS STREET C/O SHER AZAM NEAR WANNA ROAD RIAZ PUMP TANK CITY | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
240 | CONSTRUCTION OF A STREET VILLAGE RODHI KHEL UC SHAH ALAM | 0.9000 | 18000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
241 | CONSTRUCTION OF A PROTECTION BUND VILLAGE RODI KHEL | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
242 | INSTALLATION OF SOLARIZATION OF EXISTING BORE C/O GUL SHAMEER S/O BADSHAH MIR CHANNI MACHAN KHEL AMA KHEL
| 1.3500 | 27000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
243 | CONSTRUCTION OF JANZAGAH AND CULVERT VILLAGE MULAZAI | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
244 | CONSTRUCTION OF STREET FAZAL RAHIM AMMA KHEL UC AMMA KHEL | 0.7500 | 15000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
245 | CONSTRUCTION OF STREET REHMAT ALI UC AMMA KHEL | 0.7500 | 15000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
246 | INSTALLATION OF PIPE LINE MULAZAI UC MULAZAI | 0.4000 | 8000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
247 | :NSTALLATION OF PRESSURE PUMP C/O SHAH ZEB KHAN S./O ALEEM KHAN KANZAI KOROONA SHAHZAMNI UC JATATRR | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
248 | CONSTRUCTION WORK AT AMAN ULLAH DARBAR PEER SABIR SHAH BABA TANK CITY | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
249 | CONSTRUCTION OF WATER TANK GUL FARAZ KOT NAWAZ UC SARANGZONA | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
250 | :INSTALLATION OF PRESSURE PUMP HAFTAY KHAN KOT NAWAZ SARANGZONA | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
251 | :CONSTRUCTION OF WATER TANK NIMAT ULLAH UC SARANGZONA | 0.2000 | 4000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
252 | :INSTALLATION OF PRESSURE PUMP ZAHID ULLAH GARAH BUDHA JATTATR | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
253 | :CONSTRUCTION OF JANZAH GAH GUL IMAM
| 1.8000 | 36000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
254 | :INSTALLATION OF TUBE WELL GUL AWAR KOROONA KOT PATHAN SHAH ALAM | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
255 | INSTALLTION OF 270FT BORE WITH SOLAR C/O SHOKAT ANWAR S/O M ANWAR MIDAD KHEL MULAZAI | 1.9000 | 38000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
256 | CONSTRUCTION OF STREET UC GUL IMAM | 0.7000 | 14000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
257 | INSTALLATION OF PRESSURE PUMP RAMZAN S/O ABDUL MAJEED KOCHA RAJPOOT MOHALLA SHEIKHAN WALA | 0.0800 | 1600 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
258 | INSTALLATION OF 3 NO’S PRESSURE PUMP WITH C/O MALIK ADNAN KOT KAT SHAH ALAM | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
259 | CONSTRUCTION OF WATER TANK WITH PRESSURE PUMP CO SYED AZAM DAUD KHEL UC AMMA KHEL | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
260 | CONSTRUCTION OF WATER TANK C/O DR NISAR TATOOR UC TANK | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
261 | INSTALLATION OF PRESSURE PUMP SHOAIB KHAN DARAKI GUL IMAM | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
262 | CONSTRUCTION OF WATER TANK C/O SAEED KHAN UC TANK | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
263 | CONSTRUCTION OF WTAER TABK C/O ABDUR REHMAN TANK | 0.1000 | 2000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
264 | INSTALLATION OF PRESSURE C/O DAUD REHMAN KHAWAJI KHEL KOROONA TATOOR JATATTR | 0.8000 | 16000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
265 | CONSTRUCTION OF A WATER TANK CO AMEER HAMZA UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
266 | CONSTRUCTION OF A WATER TANK C/O NAIMAT/ SAID AZAM UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
267 | CONSTRUCTION OF A WATER TANK C/O HAMAYUN S/O SHAH BEHRAM UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
268 | CONSTRUCTION OF A WATER TANK C/O AMAN ULLAH SURANG UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
269 | CONSTRUCTION OF A WATER TANK CO SANA ULLAH UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
270 | CONSTRUCTION OF A WATER TANK C/O ISMAIL UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
271 | CONSTRUCTION OF A WATER TANK C/O MOSQUE FAQEERAN WALI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
272 | CONSTRUCTION OF A WATER TANK C/O SANA ULLAH URF SANU MISTRI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
273 | CONSTRUCTION OF A WATER TANK C/O KHAN GUL UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
274 | CONSTRUCTION OF A WATER TANK C/O IKRAM UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
275 | CONSTRUCTION OF A WATER TANK C/O SAID ALI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
276 | CONSTRUCTION OF A WATER TANK C/O SHER ZAMAN TRACTOR DRIVER UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
277 | CONSTRUCTION OF A WATER TANK C/O SHOUKAT /MIRZAL UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
278 | CONSTRUCTION OF A WATER TANK C/O MIR AKBAR UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
279 | CONSTRUCTION OF A WATER TANK C/O AKHTAR MACHINE WAL UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
280 | CONSTRUCTION OF A WATER TANK C/O GUL SHOW BHITTANI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
281 | :CONSTRUCTION OF A WATER TANK C/O DILAWAR BHITTANI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
282 | CONSTRUCTION OF A WATER TANK C/O KAREEM KHAN KUNDI UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
283 | CONSTRUCTION OF A WATER TANK C/O HABIR DRIVER UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
284 | CONSTRUCTION OF A WATER TANK C/O SOBAT KHAN S/O JAN KHAN UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
285 | CONSTRUCTION OF A WATER TANK C/O SHAKEEL S/O MOSAM UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
286 | CONSTRUCTION OF A WATER TANK C/O RAMZAN S/O HAQNAWAZ UC SHAH ALAM | 0.0700 | 1400 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
287 | INSTALLATION OF PRESSURE PUMP C/O ASALAM KHAN MIDAD KHEL MULAZAI | 0.1500 | 3000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
288 | :INSTALLATION OF TUBE WELL JAMAL AWAN SHEIKH UTTAR | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
289 | :INSTALLATION OF TUBE WELL UMAR GUL KOROONA UC PAI | 2.5000 | 50000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
290 | :INSTALLATION OF PIPE LINE 3”I/D & 2”I/D ABIZAR PAI | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
291 | :CONSTRUCTION OF A CULVERT JAMAL AWAN SHEIKH UTTAR | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
292 | :CONSTRUCTION OF JANZAGAH KOT KAT C/O MALIK IMRAN | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
293 | INSTALLATION OF SOLAR SYSTEM AT TUBE WELL FILLING STATION KOT KAT
| 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
294 | INSTALLATION OF PRESSURE PUMP C/O KHURSHID MULAZAI TANK | 0.5000 | 10000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
295 | :CONSTRUCTION OF CULVERTS AT CHEENA ROAD RANWAL DISTRICT TANK | 1.0000 | 20000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|
296 | CONSTRUCTION OF PCC STREET C/O IKRAM UC GUL IMAM | 1.5000 | 30000 | 0 | |
2021-03-08 12:00 AM
| 12:00:00 | 9 months |
Download BOQ
|